Upgrading HMI: Transitioning from PanelBuilder32 to FactoryTalk View ME for PanelView Plus 700

Question:

I am currently working on an HMI (Human-Machine Interface) project that involves upgrading an existing system originally developed using PanelBuilder32 and deployed on a PanelView 550 terminal. My task is to enhance the HMI screens by transferring them to a PanelView Plus 700, utilizing the FactoryTalk View ME software tailored for this edition. Here are the key requirements for the project: 1. **Replicate the Second Line HMI**: The HMI for the second line has already been successfully created in FactoryTalk View and downloaded onto the PanelView Plus 700. My goal is to design an identical HMI for the first line, replicating the setup of the second line. 2. **Utilize Existing Screens with Modifications**: I plan to leverage the existing screens from the second line, making necessary adjustments to tailor the interface for the first line. 3. **Initial Steps**: - I have commenced by exporting all HMI tags from the second line into CSV files. - I have also duplicated the screens precisely for the first line, but I am seeking guidance on how to effectively link these screens to the first line PLC (Programmable Logic Controller) program. - I would appreciate any advice on the steps necessary to assign HMI tags for the first line system properly. Your assistance with this project would be greatly valued!

Top Replies

What type of Programmable Logic Controller (PLC) is being utilized? Are both production lines integrated with the same PLC system? It seems that the existing program could be replicated by merely adjusting the tags and addresses, as well as configuring the communication settings to ensure proper data reading. Additional information would be beneficial for a more comprehensive understanding.

What is the purpose of the second line for communication with the PV+700?

The SLC 5/05 PLC utilizes Ethernet communication for seamless connectivity and efficient data exchange.

I have initiated a new application for Line 1 and replicated all the screens from Line 2. However, I'm uncertain about how to begin tagging the PLC program for Line 1 (SLC 5/05). I've consulted the manual, which suggests creating HMI tags or data server tags, but I'm unclear about the distinction between the two. What steps should I take after setting up the new application and designing the new screens? Furthermore, how can I effectively link the inputs, outputs, and memory bits from the PLC program using RSLogix 500?

Roxusa inquired: What communication method does the second line utilize for the PV+700? Click to learn more… It's Ethernet.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Import the exported HMI tags into your FactoryTalk View ME project for the first line.

Answer: 2. Modify the PLC addresses in the tags to correspond with the first line's PLC program. 3. Ensure that any screen-specific PLC logic or connections are updated to reflect the first line's requirements. 4. Test the HMI screens with the PLC to verify correct operation and communication.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →